Nevada C-2 Electrical Contractor Exam

Exam Breakdown

Number of Questions: 80 scored

Time Limit: 240 minutes (4 hours)

Passing Score: 70%

Topic Breakdown:

General Electrical Knowledge - 6 questions

Service, Feeders, and Branch Circuits - 7 questions

Grounding and Bonding - 7 questions

Conductors and Cables - 8 questions

Raceways and Boxes - 7 questions

Special Occupancies and Equipment - 5 questions

Electrical Power - 6 questions

Motors - 6 questions

Low Voltage - 2 questions

Lighting - 5 questions

Illuminated Signs - 2 questions

Fire Detection and Alarm Systems - 2 questions

Safety Information - 8 questions

Transmission Lines - 5 questions

Overcurrent Protection - 4 questions

Nevada (Clark County) Journeyman Electrician ICC G17 Exam

Exam Breakdown

QUESTIONS: 80

TIME LIMIT: 4 Hours

General Knowledge (6%)

  • Electrical Theory and General
  • Electrical Load Calculations
  • Code Definitions and Terms
  • Plan Reading

Services and Service Equipment (11%)

  • Services and Fault Current
  • Service Load Calculations
  • Service Equipment & Service Conductors
  • Transformers System
  • Grounding and Bonding
  • Temporary Service Wiring

Feeders (4%)

  • Load Calculations
  • Equipment Grounding

Branch Circuits and Conductors (19%)

  • Branch Circuit Calculation
  • Overcurrent Protection, Conductors
  • Required Outlets & GFCI / AFCI Protection
  • Equipment Grounding

Wiring Methods and Materials (26%)

  • Raceway Installations
  • Underground Wiring Methods
  • Boxes and Enclosures
  • Cabinets
  • Panelboards & Switchboards
  • Clearance and Guarding
  • Flexible Cords and Cables

Equipment and Devices (13%)

  • Luminaires, Receptacles, Switches, and Other Devices
  • Appliances and Other Equipment
  • Other Utilization Equipment
  • Heating and Cooling Equipment

Control Devices (4%)

  • Switches, Disconnects, and Controllers

Motors and Generators (6%)

  • Motors
  • Generators

Special Occupancies, Equipment, and Conditions (11%)

  • Special Occupancies
  • Swimming Pools and Similar Installations
  • Mobile Home and RV Parks
  • Data Processing Equipment
  • Miscellaneous Special Equipment
  • Emergency Systems
  • Signaling and Fire Alarm Systems

Nevada (Clark County) Master Electrician ICC G16 Exam

Exam Breakdown

QUESTIONS: 100

TIME LIMIT: 5 Hours


General Knowledge (12%)

  • Electrical Theory and General
  • Electrical Load Calculations
  • Code Definitions and Terms
  • Plan Reading

Services and Service Equipment (16%)

  • Services and Fault Current
  • Service Load Calculations
  • Service Equipment & Service Conductors
  • Transformers System Grounding and Bonding
  • Temporary Service Wiring

Feeders (4%)

  • Load Calculations
  • Equipment Grounding

Branch Circuits and Conductors (16%)

  • Branch Circuit Calculation
  • Overcurrent Protection Conductors
  • Required Outlets & GFCI / AFCI Protection
  • Equipment Grounding

Wiring Methods and Materials (19%)

  • Raceway Installations
  • Underground Wiring Methods
  • Boxes and Enclosures
  • Cabinets
  • Panel Boards & Switchboards
  • Clearance and Guarding
  • Flexible Cords and Cables

Equipment and Devices (10%)

  • Luminaires, Receptacles, Switches, and Other Devices
  • Appliances and Other Equipment
  • Other Utilization Equipment
  • Heating and Cooling Equipment

Control Devices (3%)

  • Switches, Disconnects, and Controllers

Motors and Generators (8%)

  • Motors
  • Generators

Special Occupancies, Equipment, and Conditions (12%)

  • Special Occupancies, Swimming Pools, and Similar Installations
  • Mobile Home and RV Parks
  • Data Processing Equipment
  • Miscellaneous Special Equipment
  • Emergency Systems
  • Signaling and Fire Alarm Systems

Want to pass your electrical licensing exam on the first try?

Download now to access 3,000+ practice questions and master the NEC Code!

student passing their exam using dakota prep